Looking quite good is the “new” railway tunnel along the abandoned and largely forgotten old Jurong railway line. The original tunnel was one of three built as part of an industrial line in the early 1960s, allowing goods trains to pass under Clementi Road. All three tunnels are quite surprisingly still intact. Significant bits of the line’s other paraphernalia, such as a truss bridge, five girder bridges, bits of sleepers, rusting tracks, as well as several railway signs, can also still be found.
The “new” tunnel, actually the old tunnel refurbished with an extension added is part of a preserved stretch of the Jurong Line. The stretch that is being kept runs from the point at which the line branched off just south of Bukit Timah Railway Station over to the very visible truss bridge over the Ulu Pandan River.
An extension to the tunnel was required due to the widening of Clementi Road. An effort seems to have been made to also maintain the tunnel’s original character with the retention of its corrugated lining (even if that may have had to be replaced) and also the extension into the extended length of the tunnel. Tracks, and substitute concrete sleepers have also been laid in way of the extension. What is also good to see that the water collected in the previously flooded tunnel has also been drained as part of this effort.
More on the tunnel, the Jurong Line and its remnants, can be found in the following posts:
More on the railway can also be found at : Journeys through Tanjong Pagar